The number of doors, drawers and boxes, the current finish and the level of repair needed all shape the timeline.
Preparation — cleaning, sanding and priming — takes as much care as the finish coats, and coatings need time to cure between steps.
Segor will outline a realistic schedule for your kitchen during the estimate.